AMWS — Point of Work Risk Assessment (HS_FM_06)
Complete this at the start of the task, on site. It’s the operative’s check that the work in front of them matches the RAMS, the kit and the conditions on the day.
Submit once per day per task. If conditions change mid-day (weather, scope, people, hazard), do another one. It’s quicker than the consequence of skipping it.
| Document Reference | HS_FM_06 — Point of Work Risk Assessment (PoWRA) |
| Issue Number | 2 |
| Issue Date | 12 May 2026 |
| Next Review | 12 May 2027 |
| Controlled By | Sean Ashton (HSQE Consultant, Onyx Operations) |
| Approved By | Aaron Mason, Managing Director |
| Status | Legacy DOCX template (HS_FM_06, Issue 1) retired on digital go-live. |
3. Site-specific hazards and controls
List anything site-specific not already covered by the generic RA. Add a row per hazard. What’s the hazard, who’s at risk, what are you doing to control it?
Common entries: live traffic, third-party services, deep excavation, lifting, weather, members of public, unstable ground, restricted access, lone-working risk.
On arrival, take 5 minutes to walk the site. Anything you didn’t expect? Anything that’s changed since the RAMS were written? Any new neighbours, pedestrians, ground conditions, weather, services not on the drawings?
If more than 2 on the task, list their names. They MUST be briefed on all hazards and controls — Toolbox-Talk style — before work starts.
A line or two is enough. Feedback to the supervisor + RAMS author. The kit that went missing, the method that didn’t work, the briefing that helped, the change you’d suggest.