Daily walk-around check for plant + equipment (excavators, breakers, generators, etc.). Separate from the van checks (QA_FM_08 / 09).
| Document Reference | FORM_PRE_USE_PLANT_01 — Daily Plant Pre-Use Check |
| Issue Number | 1 |
| Issue Date | 12 May 2026 |
| Next Review | 12 May 2027 |
| Controlled By | Sean Ashton (HSQE Consultant, Onyx Operations) |
| Approved By | Aaron Mason, Managing Director |
| Status | New controlled document — supports B2.14.1. |